Production & fabrication: built by the people who designed it

Stages, sets and stalls built in Showdeck's own workshop; LED, sound, lighting and power supplied and operated by our technical team; everything installed and tested in a full rehearsal before doors open.

Once the renders are approved, the drawings go to our workshop. Platforms, risers, set pieces, stall structures and branding elements are fabricated, finished and test-assembled before they travel to the venue. Truss, rigging, LED walls, line-array sound, moving lights and power distribution are specified for the room and brought in by partners we work with on every show.

Load-in follows the venue's window, usually overnight. Our crew installs, our technical team programs and tests, and we run a full technical rehearsal with your presentations, videos and the artists' sound check before the doors open. This is the part of the process that most agencies subcontract and we do not.

Photo: John Bradley, CC BY-SA 3.0, via Wikimedia Commons

What happens in this step

  • Fabrication in our workshop from the approved drawings
  • Truss, LED, sound, lighting and power booked to the technical design
  • Load-in planned to the venue's window and gate rules
  • Installation by our crew; programming by our technical team
  • Full technical rehearsal with the client's content
  • Safety sign-off: loads, fire-rated materials, cable management, exits
You receive

What you get at the end of this step

  • The finished stage, set or stall, exactly as rendered
  • A tested show file: cues, content, sound and lighting
  • Load-in and load-out schedule shared with the venue
We need from you

What makes this step quick

  • Final content: presentations, videos, LED graphics (we give the specifications)
  • Artist riders and sound-check times
  • Venue access confirmation
Questions

Asked about this step

Do you build stages outside Delhi NCR?
Yes. Sets are fabricated in our workshop and transported; our core team travels and local crew work under our supervisors.
What happens if the venue power is poor?
We bring generators and clean distribution for every technical load and test it before doors. Power failures on show day are almost always a planning failure, and we plan for them.
Can we see the set before it reaches the venue?
Yes. Clients are welcome at the workshop for the test assembly; many approve finishes and colours there.